5-11-26

Period 5:

  1. Keep working on the Ultrasonic Robot – after you have passed the Rover challenges.

2. Leveling up your Sensor robot – click here.   Add a swiveling sensor.

3. NEW Joystick and Servo – you can work on this with your partner. Show me when you are done with the circuit.

Period 4:

Today, I want to return our focus to your 3d printed bridges.

Let’s get them testing ready which means:
1. assembled OR
2. revised bridge designs sent for a reprint.

Once your bridge is done and assembled OR resubmitted for printing you can return to the 3d Model of the Campus.

Leave a Reply

Your email address will not be published. Required fields are marked *